注册

  • 获取手机验证码 60
  • 注册

找回密码

  • 获取手机验证码60
  • 找回
外文翻译网 > 搜索结果

    找到约10000个结果。

    燃油喷射外文翻译资料

    英语原文共 37 页, 英文原文 译文 Chapter 8 Fuel injection 第八章 燃油喷射 The emphasis in this chapter is on medium speed engines with camshaft actuated individual jerk pumps for each cylinder. Higher speed engines are also covered, including those which use camshaft pumps (or block pumps): those in which all the jerk pump elements are grouped into one or more complete units, each equipped with a common camshaft. This section does not apply (except in a general way) to low speed two-stroke engines whose systems are described later under individual makes. 本章的重点是凸轮轴驱动的每个缸独立的高压燃油喷射泵的中速发动机。同时包括高速发动机,还有那些使用凸轮轴泵(或梭心转子泵):那些所有的燃油喷射泵元件被组合成一个或多个完整的单

    微信小程序的发展分析外文翻译资料

    英语原文共 14 页, 英语译文共 7 页, 资料编号:[238269],资料为PDF文档或Word文档,PDF文档可免费转换为Word

    桥址和交通荷载外文翻译资料

    2.1 Introduction Oftentimes engineers deceive themselves into believing that if they have gathered enough information about a bridge site and the traffic loads, the selection of a bridge type for that situation will be automatic. Engineers seem to subscribe to the belief that once the function of a structure is properly defined, the correct form will follow .Furthermore, that form will be efficient and aesthetically pleasing .Perhaps we believe some great differential equation exists ,and ,if we could only describe the relationships and the gradients between the different parameters, apply the correct boundary conditions, and set the proper limits of integration, a solution of the equation will give us the best possible bridge configuration .Unfortunately ,or perhaps fortunately, no such equation exists that will define the optimal path If we have no equation to follow, how is a conceptual design formulated? (In this context, the word design is meant in its earliest and

    混凝土桥外文翻译资料

    7 Concrete bridges 7.1 Introduction Concrete is a versatile building material. It can be shaped to conform to almost any alignment and profile. Bridge superstructures built of reinforced and prestressed concrete can be unique one-of-a-kind structures formed and constructed at the job site, or they can be look-alike precast girders and box beams manufactured in a nearby plant. The raw materials of concrete cement, fine aggregate, coarse aggregate, and water are found in most areas of the world. In many countries without a well-developed steel industry, reinforced concrete is naturally the preferred building material. However, even in North America with its highly developed steel industry, bridges built of concrete are very competitive. Concrete bridges can be designed to satisfy almost any geometric alignment from straight to curved to doubly curved as long as the clear spans are not too large. Cast-in-place (CIP) concrete box girders are especially suited to curved align

    荷载外文翻译资料

    4 loads 4.1 Introduction The engineer must consider all the loads that are expected to be applied to the bridge during its service life. Such loads may be divided into two broad categories: permanent loads and transient loads. The permanent loads remain on the bridge for an extended period, usually for the entire service life. Such loads include the self-weight of the girders and deck, wearing surface, curbs, parapets and railings, utilities, luminaries, and pressures from earth retainment. Transient loads typically include gravity loads due to vehicular, railway, and pedestrian traffic as well as lateral loads such as those due to water and wind, ice floes, ship collisions, and earthquakes. In addition, all bridges experience temperature fluctuations on a daily and seasonal basis and such effects must be considered. Depending on the structure type, other loads such as those from creep and shrinkage may be important, and finally, the superstructure supports may move, inducin

    基于Maxwell的永磁同步电机控制研究外文翻译资料

    英语原文共 622 页, 课程题目 基于Maxwell的永磁同步电机控制研究 开题报告填写要求 1.开题报告应根据教师下发的毕业设计(论文)任务书,在教师的指导下由学生独立撰写。 2.开题报告内容填写后,应及时打印提交指导教师审阅。 3.“设计的目的及意义”至少800汉字(外语至少500字),“基本内容和技术方案”至少400汉字(外语至少200字)。进度安排应尽可能详细。 4.指导教师意见:学生的调研是否充分?基本内容和技术方案是否已明确?是否已经具备开始设计(论文)的条件?能否达到预期的目标?是否同意进入设计(论文)阶段? 撰写内容要求(可加页): 目的及意义(含国内外的研究现状分析) (1)总述 随着“中国制造2025”的提出,新能

    电力电子用新型三维集成热封装的结构可靠性外文翻译资料

    英语原文共 12 页, S. Khanna 机械工程系。马里兰大学克拉克工程学院 学院公园,MD 20742, USA sumeer87@umd.edu P. McCluskey 机械工程系。马里兰大学克拉克工程学院 学院公园,马里兰州20742,美国,mcclupa@umd.edu M. Manno 机械工程系。马里兰大学克拉克 工程学院 学院公园,MD 20742, USA manno@umd,edu Bar-Cohen 机械工程系。马里兰大学克拉克工程学院 学院公园, MD 20742, USA abc@umd.edu Yang 机械工程系。马里兰大学克拉克工程学院 学院公园,马里兰州20742,美国, MD 20742, USA baoyang@umd.edu M. Ohadi 机械工程系。马里兰大学克拉克 工程学院 学院公园, MD 20742, USA ohadi@umd.edu 摘要: 器件功率和封装集成水平的不断提高推动了先进电力电子封装解决方案的发展。本研究将集中在设计分析的数值模拟方法

    基于模糊逻辑的涉及紧急车辆抢占的 新型单路口交通灯控制器外文翻译资料

    英语原文共 14 页, 基于模糊逻辑的涉及紧急车辆抢占的 新型单路口交通灯控制器 摘要 模糊参数已成为交通运行的一种重要的智能控制方法。本文的贡献在于提出了一种新的模糊信号控制系统,用于包含紧急车辆抢占的全单结点控制。该研究不仅提出了一种新的模糊控制系统,而且同时考虑了车辆在紧急情况下的抢占和车辆在有转向运动的路口的控制。该控制系统包括模糊相位选择器和模糊绿灯相位扩展器两个主要功能。第一个模糊相位选择器指定下一个绿灯相位,由绿灯相位扩展器的功能决定是扩展还是终止当前的绿灯相位。通过仿真对系统的性能进行了评估。最后,将所提出的控制系统与定时控制系统进行了比较,仿真结果表明该控制策略比定时控制策略有明显的改进。 关键词:模糊控制系统,应急车辆抢占,全

    基于模糊逻辑的涉及紧急车辆抢占的 新型单路口交通灯控制器外文翻译资料

    英语原文共 10 页, 英语译文共 12 页, 资料编号:[238225],资料为PDF文档或Word文档,PDF文档可免费转换为Word

    直接数字合成:周期波产生的工具(第1部分)外文翻译资料

    英语原文共 9 页, 英语译文共 9 页, 资料编号:[238223],资料为PDF文档或Word文档,PDF文档可免费转换为Word

联系我们

加微信咨询

加QQ咨询

服务时间:09:00-23:50(周一至周日)